APA Citation

Aulia, M. R. (2014). OPTIMASI BIAYA DAN WAKTU PROYEK KONSTRUKSI DENGAN PENAMBAHAN JAM KERJA(LEMBUR) DI BANDINGKAN DENGAN PENAMBAHAN TENAGA KERJA MENGGUNAKAN METODE TIME COST TRADE OFF. TEKNIK.

Chicago Style Citation

Aulia, Muhamad Raa'uf. OPTIMASI BIAYA DAN WAKTU PROYEK KONSTRUKSI DENGAN PENAMBAHAN JAM KERJA(LEMBUR) DI BANDINGKAN DENGAN PENAMBAHAN TENAGA KERJA MENGGUNAKAN METODE TIME COST TRADE OFF. TEKNIK, 2014.

MLA Citation

Aulia, Muhamad Raa'uf. OPTIMASI BIAYA DAN WAKTU PROYEK KONSTRUKSI DENGAN PENAMBAHAN JAM KERJA(LEMBUR) DI BANDINGKAN DENGAN PENAMBAHAN TENAGA KERJA MENGGUNAKAN METODE TIME COST TRADE OFF. TEKNIK, 2014.

Warning: These citations may not always be 100% accurate.