Skip to content
Advanced
Advanced
  • Search
  • PRESPEKTIF PENGAMBIL KEPUTUSAN...
  • Description
  • Cite this
  • Text this
  • Email this
  • Export Record
    • Export to RefWorks
    • Export to EndNoteWeb
    • Export to EndNote
Cover Image

PRESPEKTIF PENGAMBIL KEPUTUSAN (OWNER) TERHADAP KETERLAMBATAN WAKTU PELAKSANAAN DITINJAU DARI PENENTUAN JENIS KONTRAK PROYEK PEMBANGUNAN GEDUNG DENGAN METODE PROSES HIRAKI ALANTIK

Main Author: Syafrun
Format: Skripsi S1
Language: Bahasa Indonesia
Published: UNIVERSITAS MUHAMMADIYAH YOGYAKARTA 2007
Subjects:
HIRAKI ALANTIK
Online Access: http://oaipmh-jogjalib.umy.ac.idkatalog.php?opo=lihatDetilKatalog&id=60193
PINJAM
  • Holdings
  • Description
  • Similar Items
  • Staff View
ISBN: SKR 2007

Similar Items

  • PRESPEKTIF PENGAMBIL KEPUTUSAN (OWNER) TERHADAP KETERLAMBATAN WAKTU PELAKSANAAN DITINJAU DARI PENENTUAN JENIS KONTRAK PROYEK PEMBANGUNAN GEDUNG DENGAN METODE PROSES HIRAKI ALANTIK
    by: Syafrun
    Published: (2007)
  • ANALISIS IDENTIFIKASI FAKTOR PENYEBAB KETERLAMBATAN PROYEK PEMBANGUNAN SD PASCA GEMPA DENGAN METODE PROSES HIRAKI ANALITIK (PHA) (Studi Kasus SDN Patalan Baru I, Jetis, Bantul)
    by: Woro handayani Perwita Sari
    Published: (2007)
  • ANALISIS IDENTIFIKASI FAKTOR PENYEBAB KETERLAMBATAN PROYEK PEMBANGUNAN SD PASCA GEMPA DENGAN METODE PROSES HIRAKI ANALITIK (PHA) (Studi Kasus SDN Patalan Baru I, Jetis, Bantul)
    by: Woro handayani Perwita Sari
    Published: (2007)
  • Pintar membaca Arab gundl dengan metode hiraki
    by: Agus Purwanto
    Published: (2010)
  • ANALISIS PERMODELAN DALAM PENENTUAN JENIS KONTRAK YANG TEPAT UNTUK SEBUAH PROYEK PERBAIKAN JALAN DENGAN METODE PHA (PROSES HIERARKI ANALISIS)
    by: Bayu Chandra Kusuma
    Published: (2006)

Search Options

  • Search History
  • Advanced Search

Find More

  • Browse the Catalog
  • Browse Alphabetically
  • Course Reserves
  • New Items

Need Help?

  • Search Tips
  • Ask a Librarian
  • FAQs
Loading...