Skip to content
Advanced
Advanced
  • ANALISIS PERCEPATAN DURASI PAD...
  • Holdings
  • Cite this
  • Text this
  • Email this
  • Export Record
    • Export to RefWorks
    • Export to EndNoteWeb
    • Export to EndNote
Cover Image

ANALISIS PERCEPATAN DURASI PADA PROYEK KONSTRUKSI AKIBAT PENAMBAHAN TENAGA KERJA DENGAN METODE LEAST COST ANALYSIS

Main Author: Siti Munawaroh
Format: Skripsi S1
Language: Bahasa Indonesia
Published: UNIVERSITAS MUHAMMADIYAH YOGYAKARTA 2007
Subjects:
LEAST COST ANALYSIS
Online Access: http://oaipmh-jogjalib.umy.ac.idkatalog.php?opo=lihatDetilKatalog&id=60394
PINJAM
  • Holdings
  • Description
  • Similar Items
  • Staff View

Internet

http://oaipmh-jogjalib.umy.ac.idkatalog.php?opo=lihatDetilKatalog&id=60394

Similar Items

  • ANALISIS PERCEPATAN DURASI PADA PROYEK KONSTRUKSI AKIBAT PENAMBAHAN TENAGA KERJA DENGAN METODE LEAST COST ANALYSIS
    by: Siti Munawaroh
    Published: (2007)
  • Optimasi Percepatan Durasi Dengan Penambahan Jam Kerja Pada Proyek Pembangunan Jembatan (Metode Least Cost Analysis): Jurnal Ilmiah Semesta Teknika
    by: M. Heri zulfiar
    Published: (2004)
  • Optimasi Percepatan Durasi Dengan Penambahan Jam Kerja Pada Proyek Pembangunan Jembatan (Metode Least Cost Analysis): Jurnal Ilmiah Semesta Teknika
    by: M. Heri zulfiar
    Published: (2004)
  • ANALISIS OPTIMASI PERCEPATAN DURASI PROYEK PADA PEMBANGUNAN SD MODEL KABUPATEN KUNINGAN DENGAN METODE LEAST COST ANALYSIS
    by: Leny Maharany
    Published: (2005)
  • ANALISIS OPTIMASI PERCEPATAN DURASI PROYEK PADA PEMBANGUNAN SD MODEL KABUPATEN KUNINGAN DENGAN METODE LEAST COST ANALYSIS
    by: Leny Maharany
    Published: (2005)

Search Options

  • Search History
  • Advanced Search

Find More

  • Browse the Catalog
  • Browse Alphabetically
  • Course Reserves
  • New Items

Need Help?

  • Search Tips
  • Ask a Librarian
  • FAQs
Loading...