PERENCANAAN PENJADWALAN ALOKASI TENAGA KERJA DENGAN SOFTWARE MANAJEMEN KONSTRUKSI
PELAKSANAAN PROYEK BERLANGSUNG SELAMA 261 HARI
Main Author: | AHMAD SAIHU |
---|---|
Format: | SKRIPSI PRA 2008 |
Language: | Bahasa Indonesia |
Published: |
Universitas Muhammadiyah Yogyakarta
2004
|
Subjects: | |
Online Access: |
http://oaipmh-jogjalib.umy.ac.idkatalog.php?opo=lihatDetilKatalog&id=69485 |
Similar Items
-
PERENCANAAN PENJADWALAN ALOKASI TENAGA KERJA DENGAN SOFTWARE MANAJEMEN KONSTRUKSI
by: AHMAD SAIHU
Published: (2004) -
PERENCANAAN DAN PENJADWALAN ALOKASI MATERIAL DENGAN MENGGUNAKAN SOFTWARE PENJADWALAN KONSTRUKSI
by: MUHAMMAD HARYONO
Published: (2004) -
PERENCANAAN DAN PENJADWALAN ALOKASI MATERIAL DENGAN MENGGUNAKAN SOFTWARE PENJADWALAN KONSTRUKSI
by: MUHAMMAD HARYONO
Published: (2004) -
PERENCANAAN DAN PENJADUALAN ALOKASI TENAGA KERJA DENGAN MENGGUNAKAN SOFTWARE PENJADUALAN PROYEK KONSTRUKSI (STUDI KASUS PEMBANGUNAN PASAR SAMPANG KECAMATAN SMAPANG CILACAP)
by: FARIDA ERI KURNIAWAN
Published: (2004) -
PERENCANAAN DAN PENJADUALAN ALOKASI TENAGA KERJA DENGAN MENGGUNAKAN SOFTWARE PENJADUALAN PROYEK KONSTRUKSI (STUDI KASUS PEMBANGUNAN PASAR SAMPANG KECAMATAN SMAPANG CILACAP)
by: FARIDA ERI KURNIAWAN
Published: (2004)