ANALISA METODE NILAI HASIL UNTUK PENGENDALIAN BIAYA DAN JADWAL PELAKSANAAN PADA PROYEK PEMBANGUNAN GEDUNG "CENTRAL OPERATING THEATRE" RSUP DR SARDJITO YOGYAKARTA
PENELITIAN INI BERTUJUAN UNTUK MENGETAHUI ANALISA METODE NILAI HASIL UNTUK PENGENDALIAN BIAYA DAN JADWAL PELAKSANAAN PADA PROYEK PEMBANGUNAN GEDUNG "CENTRAL OPERATING THEATRE" RSUP DR SARDJITO YOGYAKARTA
Main Author: | ATIKATUL KHASANAH |
---|---|
Format: | SKRIPSI PRA 2008 |
Language: | Bahasa Indonesia |
Published: |
Universitas Muhammadiyah Yogyakarta
2001
|
Online Access: |
http://oaipmh-jogjalib.umy.ac.idkatalog.php?opo=lihatDetilKatalog&id=70949 |
Similar Items
-
ANALISA METODE NILAI HASIL UNTUK PENGENDALIAN BIAYA DAN JADWAL PELAKSANAAN PADA PROYEK PEMBANGUNAN GEDUNG "CENTRAL OPERATING THEATRE" RSUP DR SARDJITO YOGYAKARTA
by: ATIKATUL KHASANAH
Published: (2001) -
STUDI PENGENDALIAN WAKTU DAN PENGARUHNYA TERHADAP BIAYA PELAKSANAAN PADA PROYEK PEMBANGUNAN GEDUNG PENGADILAN TINGGI YOGYAKARTA TAHAP II
by: ARIF MUSTOFA
Published: (2010) -
Proyek Pembangunan Gedung Parkir Dan Diklat Tahap III RSUP. Dr. Sardjito Yogyakarta
by: Deki Dwi Sambudi
Published: (2006) -
Proyek Pembangunan Gedung Parkir Dan Diklat Tahap III RSUP Dr. Sardjito Yogyakarta
by: Laurentius F.X.R.Ladjadjawa
Published: (2005) -
Analisis Kinerja Biaya dan Jadwal Terpadu Dengan Menggunakan Konsep Metode Nilai Hasil
by: Faris Fauzan Muhammad
Published: (2015)