Skip to content
Advanced
Advanced
  • Search
  • ANALISIS PENGENDALIAN PRESTASI...
  • Holdings
  • Cite this
  • Text this
  • Email this
  • Export Record
    • Export to RefWorks
    • Export to EndNoteWeb
    • Export to EndNote
Cover Image

ANALISIS PENGENDALIAN PRESTASI KERJA MENGGUNAKAN METHODE WORK BREAKDOWN STRUCTURE (WBS) DAN KURVA-S

Main Author: Zulnafri
Format: Skripsi S1
Language: Bahasa Indonesia
Published: 2006
Online Access: http://library.umy.ac.id/katalog.php?opo=lihatDetilKatalog&id=40019
PINJAM
  • Holdings
  • Description
  • Similar Items
  • Staff View

Internet

http://library.umy.ac.id/katalog.php?opo=lihatDetilKatalog&id=40019

Similar Items

  • ANALISIS PENGENDALIAN PRESTASI KERJA MENGGUNAKAN METHODE WORK BREAKDOWN STRUCTURE (WBS) DAN KURVA-S
    by: Zulnafri
    Published: (2006)
  • ANALISIS ANGGARAN PELAKSANAAN PROYEK RUMAH MEWAH DENGAN PENDEKATAN WORK BREAKDOWN STRUCTURE (WBS)
    by: WIJIANTO
    Published: (2004)
  • ANALISIS ANGGARAN PELAKSANAAN PROYEK RUMAH MEWAH DENGAN PENDEKATAN WORK BREAKDOWN STRUCTURE (WBS)
    by: WIJIANTO
    Published: (2004)
  • Perhitungan nilai nisbah hantaran sedimen dengan menggunakan kurva sedimen dan model erosi tanah
    by: Nining Wahyuningrum, Putu Sudira
    Published: (2014)
  • Perhitungan nilai nisbah hantaran sedimen dengan menggunakan kurva sedimen dan model erosi tanah
    by: Nining Wahyuningrum, Putu Sudira
    Published: (2014)

Search Options

  • Search History
  • Advanced Search

Find More

  • Browse the Catalog
  • Browse Alphabetically
  • Course Reserves
  • New Items

Need Help?

  • Search Tips
  • Ask a Librarian
  • FAQs
Loading...