OPTIMASI BIAYA MENGGUNAKAN METODE LEAST COST ANALYSIS (Studi Kasus Proyek Pembangunan Perumahan Puri Cempaka Yogyakarta Type 64/105)
Main Author: | Maulidaini |
---|---|
Format: | Skripsi S1 |
Language: | Bahasa Indonesia |
Published: |
UNIVERSITAS MUHAMMADIYAH YOGYAKARTA
2007
|
Subjects: | |
Online Access: |
http://oaipmh-jogjalib.umy.ac.idkatalog.php?opo=lihatDetilKatalog&id=60373 |
Similar Items
-
OPTIMASI BIAYA MENGGUNAKAN METODE LEAST COST ANALYSIS (Studi Kasus Proyek Pembangunan Perumahan Puri Cempaka Yogyakarta Type 64/105)
by: Maulidaini
Published: (2007) -
MANAJEMEN INVESTASI PEMBANGUNAN PERUMAHAN PURI CEMPAKA YOGYAKARTA TIPE 64/105
by: Henny Putriani Razak
Published: (2007) -
MANAJEMEN INVESTASI PEMBANGUNAN PERUMAHAN PURI CEMPAKA YOGYAKARTA TIPE 64/105
by: Henny Putriani Razak
Published: (2007) -
OPTIMASI PENJADWALAN DENGAN PENAMBAHAN TENAGA KERJA MENGGUNAKAN METODE LEAST COST ANALYSIS (STUDI KASUS PROYEK PEMBANGUNAN GEDUNG EKSAK UMY)
by: HERMANSYAH
Published: (2005) -
OPTIMASI PENJADWALAN DENGAN PENAMBAHAN TENAGA KERJA MENGGUNAKAN METODE LEAST COST ANALYSIS (STUDI KASUS PROYEK PEMBANGUNAN GEDUNG EKSAK UMY)
by: HERMANSYAH
Published: (2005)