PERENCANAAN PERCEPATAN DURASI PROYEK PEMBANGUNAN GEDUNG LABORATORIUM DAN WORKSHOP
NILAI TOTAL DURASI PROYEK SETELAH DIPERCEPAT ADALAH 295 AHRI
Main Author: | SUDIANTO |
---|---|
Format: | SKRIPSI PRA 2008 |
Language: | Bahasa Indonesia |
Published: |
Universitas Muhammadiyah Yogyakarta
2003
|
Subjects: | |
Online Access: |
http://oaipmh-jogjalib.umy.ac.idkatalog.php?opo=lihatDetilKatalog&id=69760 |
Similar Items
-
PERENCANAAN PERCEPATAN DURASI PROYEK PEMBANGUNAN GEDUNG LABORATORIUM DAN WORKSHOP
by: SUDIANTO
Published: (2003) -
PERENCANAAN DAN PENJADUALAN ALOKASI BAHAN/MATERIAL PADA PROYEK PEMBANGUNAN GEDUNG LABORATORIUM DAN WORKSHOP
by: M.MIZANI ZAKIYUN SUJA
Published: (2003) -
PERENCANAAN DAN PENJADUALAN ALOKASI BAHAN/MATERIAL PADA PROYEK PEMBANGUNAN GEDUNG LABORATORIUM DAN WORKSHOP
by: M.MIZANI ZAKIYUN SUJA
Published: (2003) -
ANALISIS PERCEPATAN DURASI PADA PROYEK BANGUNAN GEDUNG AKIBAT PENAMBAHAN JAM KERJA
by: MEIJI HERI SAPTAWATY
Published: (2008) -
ANALISIS OPTIMASI PERCEPATAN DURASI PROYEK REHABILITASI GEDUNG DENGAN METODE : LEAST COST ANALYSIS
by: YULIANTO
Published: (2007)