JURNAL NASIONAL TEKNIK ELEKTRO DAN TEKNOLOGI INFORMASI: Peningkatan Akurasi Estimasi Usaha dan Biaya COCOMO II Berdasarkan Gaussian dan BCO
An accurate effort and cost estimation provides good management for software projects. Less accurate estimation will affect the management of the software project and cause the ineffectiveness of the project development process. The addition of cost driver, introduced by Barry Boehm in 2000, is used...
Main Author: | Rahmi Rizkiana Putri, Daniel Oranova Siahaan, Sarwosri Sarwosri |
---|---|
Format: | Jurnal |
Language: | Bahasa Indonesia |
Published: |
Teknik elektro UGM
2017
|
Subjects: | |
Online Access: |
http://oaipmh-jogjalib.umy.ac.idkatalog.php?opo=lihatDetilKatalog&id=82870 |
Similar Items
-
JURNAL NASIONAL TEKNIK ELEKTRO DAN TEKNOLOGI INFORMASI: Peningkatan Akurasi Estimasi Usaha dan Biaya COCOMO II Berdasarkan Gaussian dan BCO
by: Rahmi Rizkiana Putri, Daniel Oranova Siahaan, Sarwosri Sarwosri
Published: (2017) -
JURNAL NASIONAL TEKNIK ELEKTRO DAN TEKNOLOGI INFORMASI: Perbaikan Prediksi Kesalahan Perangkat Lunak Menggunakan Seleksi Fitur dan Cluster-Based Classification
by: Fachrul Pralienka Bani Muhamad, Daniel Oranova Siahaan, Chastine Fatichah
Published: (2017) -
JURNAL NASIONAL TEKNIK ELEKTRO DAN TEKNOLOGI INFORMASI: Perbaikan Prediksi Kesalahan Perangkat Lunak Menggunakan Seleksi Fitur dan Cluster-Based Classification
by: Fachrul Pralienka Bani Muhamad, Daniel Oranova Siahaan, Chastine Fatichah
Published: (2017) -
Pengkombinasian Pohon Keputusan Data Pecilan Kelas dan Pohon Keputusan Data Nornal untuk Peningkatan Akurasi Prediksi Cacat Perangkat Lunak
by: Utomo Pujianto, Daniel Oranova Siahaan
Published: (2012) -
Pengkombinasian Pohon Keputusan Data Pecilan Kelas dan Pohon Keputusan Data Nornal untuk Peningkatan Akurasi Prediksi Cacat Perangkat Lunak
by: Utomo Pujianto, Daniel Oranova Siahaan
Published: (2012)