ANALISIS OPTIMASI PENAMBAHAN JAM KERJA DENGAN METODE "LEAST COST ANALYSIS"
PERCEPATAN DURASI PROYEK YANG DAPAT DILAKUKAN DENGAN LEMBUR 4 JAM ADALAH 25 HARI KERJA
Main Author: | SUGIYANTI |
---|---|
Format: | SKRIPSI PRA 2008 |
Language: | Bahasa Indonesia |
Published: |
Universitas Muhammadiyah Yogyakarta
2004
|
Subjects: | |
Online Access: |
http://oaipmh-jogjalib.umy.ac.idkatalog.php?opo=lihatDetilKatalog&id=69443 |
Similar Items
-
ANALISIS OPTIMASI PENAMBAHAN JAM KERJA DENGAN METODE "LEAST COST ANALYSIS"
by: SUGIYANTI
Published: (2004) -
ANALISIS OPTIMASI PENAMBAHAN TENAGA KERJA DENGAN METODE "LEAST COST ANALYSIS"
by: NURHAYATI
Published: (2004) -
ANALISIS OPTIMASI PENAMBAHAN TENAGA KERJA DENGAN METODE "LEAST COST ANALYSIS"
by: NURHAYATI
Published: (2004) -
Optimasi Percepatan Durasi Dengan Penambahan Jam Kerja Pada Proyek Pembangunan Jembatan (Metode Least Cost Analysis): Jurnal Ilmiah Semesta Teknika
by: M. Heri zulfiar
Published: (2004) -
Optimasi Percepatan Durasi Dengan Penambahan Jam Kerja Pada Proyek Pembangunan Jembatan (Metode Least Cost Analysis): Jurnal Ilmiah Semesta Teknika
by: M. Heri zulfiar
Published: (2004)