ANALISIS PERCEPATAN DURASI PADA PROYEK BANGUNAN GEDUNG AKIBAT PENAMBAHAN JAM KERJA
DURASI BERKURANG DARI 120 HARI KERJA MENJADI 111 HARI KERJA
Main Author: | MEIJI HERI SAPTAWATY |
---|---|
Format: | SKRIPSI PRA 2008 |
Language: | Bahasa Indonesia |
Published: |
Universitas Muhammadiyah Yogyakarta
2008
|
Subjects: | |
Online Access: |
http://oaipmh-jogjalib.umy.ac.idkatalog.php?opo=lihatDetilKatalog&id=69491 |
Similar Items
-
ANALISIS PERCEPATAN DURASI PADA PROYEK BANGUNAN GEDUNG AKIBAT PENAMBAHAN JAM KERJA
by: MEIJI HERI SAPTAWATY
Published: (2008) -
ANALISIS PERCEPATAN DURASI PADA PROYEK KONSTRUKSI AKIBAT PENAMBAHAN TENAGA KERJA DENGAN METODE LEAST COST ANALYSIS
by: Siti Munawaroh
Published: (2007) -
ANALISIS PERCEPATAN DURASI PADA PROYEK KONSTRUKSI AKIBAT PENAMBAHAN TENAGA KERJA DENGAN METODE LEAST COST ANALYSIS
by: Siti Munawaroh
Published: (2007) -
Optimasi Percepatan Durasi Dengan Penambahan Jam Kerja Pada Proyek Pembangunan Jembatan (Metode Least Cost Analysis): Jurnal Ilmiah Semesta Teknika
by: M. Heri zulfiar
Published: (2004) -
Optimasi Percepatan Durasi Dengan Penambahan Jam Kerja Pada Proyek Pembangunan Jembatan (Metode Least Cost Analysis): Jurnal Ilmiah Semesta Teknika
by: M. Heri zulfiar
Published: (2004)