Skip to content
Advanced
Advanced
  • Search
  • STUDI ANALISIS PENGALOKASIAN B...
  • Holdings
  • Cite this
  • Text this
  • Email this
  • Export Record
    • Export to RefWorks
    • Export to EndNoteWeb
    • Export to EndNote
Cover Image

STUDI ANALISIS PENGALOKASIAN BIAYA SUMBER DAYA PERALATAN (BERAT) PADA PROYEK PENGERUKAN SUNGAI

PENGERUKAN DENGAN MENGGUAKAN FLOATING EXCAVATOR LONG ARM BIAYA YANG KELUAR SEBESAR Rp 21.948.800

Main Author: DIDDA RAMDHANY KUSUMAH
Format: SKRIPSI PRA 2008
Language: Bahasa Indonesia
Published: Universitas Muhammadiyah Yogyakarta 2002
Subjects:
PENGALOKASIAN BIAYA SUMBER DAYA PERALATAN, PENGERUKAN SUNGAI
Online Access: http://oaipmh-jogjalib.umy.ac.idkatalog.php?opo=lihatDetilKatalog&id=70167
PINJAM
  • Holdings
  • Description
  • Similar Items
  • Staff View

Internet

http://oaipmh-jogjalib.umy.ac.idkatalog.php?opo=lihatDetilKatalog&id=70167

Similar Items

  • STUDI ANALISIS PENGALOKASIAN BIAYA SUMBER DAYA PERALATAN (BERAT) PADA PROYEK PENGERUKAN SUNGAI
    by: DIDDA RAMDHANY KUSUMAH
    Published: (2002)
  • STUDI ANALISIS ULANG PERENCANAAN DAN PENJADWALAN SUMBER DAYA PERALATAN (BERAT) PADA PROYEK PENGERUKAN SUNGAI
    by: BARON PURNAMA SOULTAN
    Published: (2002)
  • STUDI ANALISIS ULANG PERENCANAAN DAN PENJADWALAN SUMBER DAYA PERALATAN (BERAT) PADA PROYEK PENGERUKAN SUNGAI
    by: BARON PURNAMA SOULTAN
    Published: (2002)
  • ANALISIS DAMPAK PENGERUKAN SEDIMEN (DREDGING) PADA SUNGAI PROGO MENGGUNAKAN APLIKASI HEC-RAS 5.0.0 ( Studi Kasus Jembatan Kebun Agung II, Sungai Progo)
    by: Moh Dwi Aprilianto
    Published: (2016)
  • ANALISIS DAMPAK PENGERUKAN SEDIMEN (DREDGING) PADA SUNGAI PROGO MENGGUNAKAN APLIKASI HEC-RAS 5.0.0 ( Studi Kasus Jembatan Kebun Agung II, Sungai Progo)
    by: Moh Dwi Aprilianto
    Published: (2016)

Search Options

  • Search History
  • Advanced Search

Find More

  • Browse the Catalog
  • Browse Alphabetically
  • Course Reserves
  • New Items

Need Help?

  • Search Tips
  • Ask a Librarian
  • FAQs
Loading...