STUDI ANALISIS PENGALOKASIAN BIAYA SUMBER DAYA PERALATAN (BERAT) PADA PROYEK PENGERUKAN SUNGAI
PENGERUKAN DENGAN MENGGUAKAN FLOATING EXCAVATOR LONG ARM BIAYA YANG KELUAR SEBESAR Rp 21.948.800
Main Author: | DIDDA RAMDHANY KUSUMAH |
---|---|
Format: | SKRIPSI PRA 2008 |
Language: | Bahasa Indonesia |
Published: |
Universitas Muhammadiyah Yogyakarta
2002
|
Subjects: | |
Online Access: |
http://oaipmh-jogjalib.umy.ac.idkatalog.php?opo=lihatDetilKatalog&id=70167 |
Similar Items
-
STUDI ANALISIS PENGALOKASIAN BIAYA SUMBER DAYA PERALATAN (BERAT) PADA PROYEK PENGERUKAN SUNGAI
by: DIDDA RAMDHANY KUSUMAH
Published: (2002) -
STUDI ANALISIS ULANG PERENCANAAN DAN PENJADWALAN SUMBER DAYA PERALATAN (BERAT) PADA PROYEK PENGERUKAN SUNGAI
by: BARON PURNAMA SOULTAN
Published: (2002) -
STUDI ANALISIS ULANG PERENCANAAN DAN PENJADWALAN SUMBER DAYA PERALATAN (BERAT) PADA PROYEK PENGERUKAN SUNGAI
by: BARON PURNAMA SOULTAN
Published: (2002) -
ANALISIS DAMPAK PENGERUKAN SEDIMEN (DREDGING) PADA SUNGAI PROGO MENGGUNAKAN APLIKASI HEC-RAS 5.0.0
( Studi Kasus Jembatan Kebun Agung II, Sungai Progo)
by: Moh Dwi Aprilianto
Published: (2016) -
ANALISIS DAMPAK PENGERUKAN SEDIMEN (DREDGING) PADA SUNGAI PROGO MENGGUNAKAN APLIKASI HEC-RAS 5.0.0
( Studi Kasus Jembatan Kebun Agung II, Sungai Progo)
by: Moh Dwi Aprilianto
Published: (2016)